Page content:
Start of the A350 production at Premium AEROTEC: First CFRP placement on the layup tool for A350 upper shell section 13/14 in Nordenham.
New A350 hall of Premium AEROTEC's Augsburg site (plant I) in February, 2010
The new halls for the A350 in Nordenham early June 2010 (first hall completed)
The autoclave for Nordenham had been delivered directly at the seashipping pier in front of the Premium AEROTEC site from where it had been only some hundred meters to its final destination in the new A350 production hall
A350 production system made by Premium AEROTEC Varel: Curing Tool for producing the CFRP side shells of section 16-18 for the Airbus A350 XWB
Calibration of the NDT (non-destructive testing) bench for supervising the A350-CFRP shells (size up to 18 meters length and 6 meters height) in Augsburgs new A350 hall
Calibration of the new outline cutting system for the A350-CFRP shells in Augsburgs new A350 hall (plant I)
Fiber placement system for the production of A350 CFRP shells in Augsburg at Premium AEROTEC
Fiber placement system for the production of A350 CFRP shells at Premium AEROTEC in Nordenham
Thermoplast parts, manufactured by Premium AEROTEC in Augsburg, to be used as connectors for CFRP parts within the A350
Thermoplast parts, manufactured by Premium AEROTEC in Augsburg, to be used as connectors for CFRP parts within the A350
Forming station for the new thermoplast parts, manufactured by Premium AEROTEC in Bremen, to be used as connectors for CFRP parts within the A350
Automated manufacturing system for thermoplast parts at Premium AEROTEC in Bremen
Automated manufacturing system for thermoplast parts at Premium AEROTEC in Bremen






















